Framing in Calistoga

Pictures of framing on an almost psychedelicly clear Spring day in the Napa Valley.




.




A glu-lam beam runs around the outside top of the second story wall, supported by light posts. Shear is handled by a two-story brace frame in the center of each side (three are visable below, set to the inside of the bale wall








Zack Styskal imitates a stud while checking plumb on one of the posts








Zack hangs from a metal brace in the center. Other bracing is temporary

.


Jaques Levy looks through the roof trusses
.



Vicki in front of a brace frame.




The path to the job trailer through the drying mud.



on to the  baleraising!